No. |
Location of project |
Client |
Project Name |
Description of Services |
Year |
|
1 |
Red Sea
State
|
Dodsal |
Musmar –
Port Sudan
32ً
Pipeline |
GPS Control points, detailed survey, route alignment,
profiling & drawings for length of 238 Km. |
2004 |
|
2 |
Khartoum, River Nile & Red Sea
States |
Dodsal |
Khartoum
- Port Sudan 12ً
Pipeline |
GPS Control points, detailed survey, route alignment,
profiling & drawings for length of 740 Km. |
2004 |
|
3 |
West Kordufan |
GONPC |
Neem - Diffra 16ً Pipeline |
GPS Control points, detailed survey, route alignment,
soil investigation, profiling & drawings for length of
100 Km. |
2005 |
|
4 |
Unity & Blue Nile
States |
WNPOC |
Block 5A, 5B & 8 |
Pipe Line, Well locations, well pads, establishment of
the Geodetic control point network, bathymetric survey,
route selections and supervision of roads |
2005 |
|
|
| |